Starwood "W" Hotel Seattle
Sector: Car parking • Location: United States of America (USA)
Source: Kiewit Construction
The Starwood Hotel is a four-star, 426-room, “W” brand hotel in downtown Seattle. W-Seattle includes a fine dining restaurant, nine meeting rooms, a 4,500 SF ballroom, and three levels of indoor parking. From base to pinnacle, the building sits 390 feet high, while the exterior features a combination of colored, precast-concrete panels and a glazed-glass, curtainwall system. Construction proceeded
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Starwood Hotel is a four-star, 426-room, “W” brand hotel in downtown Seattle. W-Seattle includes a fine dining restaurant, nine meeting rooms, a 4,500 SF ballroom, and three levels of indoor parking. From base to pinnacle, the building sits 390 feet high, while the exterior features a combination of colored, precast-concrete panels and a glazed-glass, curtainwall system. Construction proceeded through the wettest winter in Seattle’s history, with rainfall exceeding the winter average by 63%. This made the schedule of placing a 10,000 SF, post-tensioned tower floor each week even more challenging. Typical tower floors contain 20 guest rooms, a housekeeping room, an ice/vending machine room, and an elevator lobby. The building site was tightly confined throughout construction. This problem was magnified during the placement of the 5,000 cubic yard concrete mat foundation. The operation required six concrete pumps and 20 trucks delivering 500 loads of concrete from three batch plants. To limit disruptions to traffic and neighboring businesses, equipment and materials were stored in a closed traffic lane or in a vacated alley adjacent to the site. Hotel finishes include Honduran Mahogany millwork, veneer plastered accents, stainless steel guardrails, marble counters, limestone, and terrazzo and oak wood floor. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
