logo

Starwood "W" Hotel Seattle

Sector: Car parking • Location: United States of America (USA)

Source: Kiewit Construction

Project
Completed

The Starwood Hotel is a four-star, 426-room, “W” brand hotel in downtown Seattle. W-Seattle includes a fine dining restaurant, nine meeting rooms, a 4,500 SF ballroom, and three levels of indoor parking. From base to pinnacle, the building sits 390 feet high, while the exterior features a combination of colored, precast-concrete panels and a glazed-glass, curtainwall system. Construction proceeded

Project Information FAQ

Project Information

5 Q
The project “Starwood "W" Hotel Seattle” is an infrastructure initiative in the Car parking sector, located in United States of America (USA). Taiyo aggregates data on it from Kiewit Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Starwood Hotel is a four-star, 426-room, “W” brand hotel in downtown Seattle. W-Seattle includes a fine dining restaurant, nine meeting rooms, a 4,500 SF ballroom, and three levels of indoor parking. From base to pinnacle, the building sits 390 feet high, while the exterior features a combination of colored, precast-concrete panels and a glazed-glass, curtainwall system. Construction proceeded through the wettest winter in Seattle’s history, with rainfall exceeding the winter average by 63%. This made the schedule of placing a 10,000 SF, post-tensioned tower floor each week even more challenging. Typical tower floors contain 20 guest rooms, a housekeeping room, an ice/vending machine room, and an elevator lobby. The building site was tightly confined throughout construction. This problem was magnified during the placement of the 5,000 cubic yard concrete mat foundation. The operation required six concrete pumps and 20 trucks delivering 500 loads of concrete from three batch plants. To limit disruptions to traffic and neighboring businesses, equipment and materials were stored in a closed traffic lane or in a vacated alley adjacent to the site. Hotel finishes include Honduran Mahogany millwork, veneer plastered accents, stainless steel guardrails, marble counters, limestone, and terrazzo and oak wood floor.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data