State Alternative Plan Program (SAPP)
The status, timeline and source of this project. A free account opens every field.
Source: Grants.gov
The Middle Class Tax Relief and Job Creation Act of 2012 (Pub. L. No. 112-96, Title VI, 126 Stat. 256 (codified at 47 U.S.C. 1401 et seq.)) (Act) established the First Responder Network Authority (FirstNet) as an independent authority within NTIA. The Act also describes FirstNet’s duty and responsibility to ensure the deployment and operation of a nationwide public safety broadband network (NPSBN)
- Status
- Closed
- Sector
- Broadband, Telecommunications, Government
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about State Alternative Plan Program (SAPP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Middle Class Tax Relief and Job Creation Act of 2012 (Pub. L. No. 112-96, Title VI, 126 Stat. 256 (codified at 47 U.S.C. 1401 et seq.)) (Act) established the First Responder Network Authority (FirstNet) as an independent authority within NTIA. The Act also describes FirstNet’s duty and responsibility to ensure the deployment and operation of a nationwide public safety broadband network (NPSBN). The NPSBN will, by law, initially consist of a core network, operated by FirstNet, and radio access networks (RAN) in each State that link to the core to ensure that a single, nationwide network architecture is available to deliver broadband services to public safety personnel and entities in each State, Territory, and the District of Columbia. The Act further assigns to NTIA the obligation to determine whether a State, if it seeks the authority to deploy the RAN within its borders, will be able to seamlessly interoperate with the NPSBN, and be financially and technically sustainable. An applicant must apply for authority to enter into a Spectrum Manager Lease Agreement (SMLA) with FirstNet (Lease Authority), and may apply for optional grant funds to assist in the construction of its RAN (RAN Construction Funds). This NOFO addresses both the mandatory grant of the right to enter into an SMLA with FirstNet and the optional RAN Construction Funds grant under NTIA’s grant program. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Broadband, Telecommunications, Government |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
