State Parks Wws Upgrades
Sector: Water Supply and Storage • Location: Camp Verde, Arizona, United States of America
Source: Dodge USA
Potable water and wastewater improvements. 6 piping, isolation valves and valve risers, and a new backflow preventor at the entry to the park. Wastewater treatment system will be upgraded with various improvements, including repurposing the existing sludge holding tank and associated equipment. Rehabilitation to the FEC and replacement of the disinfection system. Expansion of the park s RV dump st
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Car parking, Manufacturing (Industrial), Road, Automotive
- Location
- Camp Verde, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about State Parks Wws Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Potable water and wastewater improvements. 6 piping, isolation valves and valve risers, and a new backflow preventor at the entry to the park. Wastewater treatment system will be upgraded with various improvements, including repurposing the existing sludge holding tank and associated equipment. Rehabilitation to the FEC and replacement of the disinfection system. Expansion of the park s RV dump station to add two new lanes and allow queueing from both directions. Installation of new manufactu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Camp Verde |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Car parking, Manufacturing (Industrial), Road, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
