State Project No 0053-0196 Automated Work Zone Speed Control Deployment
The owner, status and timeline of this project. A free account opens every field.
Source: Patch
The Connecticut Department of Transportation is using Automated Work Zone Speed Control within the limits of State Project No 0053-0196, which involves the rehabilitation of the bridge and Route 2 eastbound lane modifications from Exit 4B to Exit 6 in Glastonbury. The program uses speed safety cameras to reduce speeding, crashes, injuries, and fatalities in work zones by capturing information abou
- Status
- Under Construction
- Sector
- Automotive, Road, Bridge, Government
- Location
- Glastonbury, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about State Project No 0053-0196 Automated Work Zone Speed Control Deployment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under deployment |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Connecticut Department of Transportation is using Automated Work Zone Speed Control within the limits of State Project No 0053-0196, which involves the rehabilitation of the bridge and Route 2 eastbound lane modifications from Exit 4B to Exit 6 in Glastonbury. The program uses speed safety cameras to reduce speeding, crashes, injuries, and fatalities in work zones by capturing information about vehicles that speed through select work zones. The deployment is currently for equipment calibration and data collection, with no warnings or citations being issued during this phase. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Glastonbury |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Automotive, Road, Bridge, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in USA
- Turnpike Resurfacing Improvements MP 260 to MP 265
- Digital Parking Permit Portal
- Residential Permit Parking Area 'L' and 'S' Establishments
- Curbside Level 2 Electric Vehicle Charging
- Transportation Fact Sheet
- Western Bay Bridge Approach Trolley Overhead Reroute Project
- Alternative Fuel Bus Program
- No. 22 Fillmore and No. 33 Stanyan Trolley Overhead Reconstruction Project
