State Road 37 Improvement Project
Sector: Road • Location: Fishers, Indiana, United States
Source: LarryInFishers
The State Road 37 Improvement Project in Fishers transformed a heavily traveled corridor known for congestion and traffic signals into a free-flowing roadway with grade-separated interchanges and roundabouts. The project included interchanges at 126th, 131st, 141st, and 146th streets, designed to eliminate stop-and-go traffic, improve safety, and prepare the corridor for growth. Construction began
- Status
- Closed
- Sector
- Road
- Location
- Fishers, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- LarryInFishers
ConstructChat
Ask ConstructChat about State Road 37 Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The State Road 37 Improvement Project in Fishers transformed a heavily traveled corridor known for congestion and traffic signals into a free-flowing roadway with grade-separated interchanges and roundabouts. The project included interchanges at 126th, 131st, 141st, and 146th streets, designed to eliminate stop-and-go traffic, improve safety, and prepare the corridor for growth. Construction began in 2018 and was completed with the opening of the 141st Street interchange in 2026. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Fishers |
Source
Source | LarryInFishers |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
