logo

State Road 47 from U.S. 129 to the Santa Fe River resurfacing

Sector: Road • Location: Trenton, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

Construction is underway on a FDOT resurfacing project along 11 miles of SR 47 from U.S. 129 in Trenton to just north of the Santa Fe River. The resurfacing project includes the removal and replacement of the upper layers of asphalt, drainage improvements, cross slope and super elevated curve corrections at various locations throughout the project limits, and driveway rehabilitation at various loc

Project Information FAQ

Project Information

5 Q
The project “State Road 47 from U.S. 129 to the Santa Fe River resurfacing” is an infrastructure initiative in the Road sector, located in Trenton, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction is underway on a FDOT resurfacing project along 11 miles of SR 47 from U.S. 129 in Trenton to just north of the Santa Fe River. The resurfacing project includes the removal and replacement of the upper layers of asphalt, drainage improvements, cross slope and super elevated curve corrections at various locations throughout the project limits, and driveway rehabilitation at various locations throughout the project limits. Additionally, the project will widen the turn radiuses at County Road 138 and 38th Place. Traffic will be maintained in accordance with FDOT standards. Drivers can expect lane closures and flagging operations after 8:30 a.m. Monday through Friday as well as any time during the weekend. FDOT will prohibit lane closures in school zones from one hour before school begins until 30 minutes after school begins and from one hour before school ends until 30 minutes after school ends.FDOT selected Preferred Materials Inc. to complete this $13 million project by fall 2024, weather and unforeseen circumstances permitting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data