State Road 912 Resurfacing Project
Sector: Road • Location: East Chicago/Gary/Hammond, Indiana, United States
Source: Indiana 105
Resurfacing project on State Road 912 between U.S. 12 and south of 15th Avenue including on and off ramps. The project involves ramp closures for resurfacing, culvert replacement, pipe liner installation, full and partial depth patching, guardrail replacement, and pavement markings. Work is ongoing through the end of September 2026.
- Status
- Under Construction
- Sector
- Road
- Location
- East Chicago/Gary/Hammond, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Indiana 105
ConstructChat
Ask ConstructChat about State Road 912 Resurfacing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Resurfacing project on State Road 912 between U.S. 12 and south of 15th Avenue including on and off ramps. The project involves ramp closures for resurfacing, culvert replacement, pipe liner installation, full and partial depth patching, guardrail replacement, and pavement markings. Work is ongoing through the end of September 2026. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Indiana |
City | East Chicago/Gary/Hammond |
Source
Source | Indiana 105 |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
