logo

STATE ROUTE 1 (PACIFIC COAST HIGHWAY) DRAINAGE RESTORATION PROJECT AND BRIDGE REPLACEMENT AT SOLSTICE CANYON CREEK

Sector: Bridge • Location: CA, United States of America

Source: US Department of Transportation (USDOT)

Project
Close

Other Agencies with Actions or Authorizations: California Description: The California Department of Transportation (Caltrans) proposes a drainage restoration project at nineteen (19) locations on State Route 1 (Pacific Coast Highway) in the cities of Los Angeles, Malibu, and unincorporated areas within Los Angeles County (post miles 37.67 to 62.86) and Ventura County (post miles 0.00 to 0.92). The

Project Information FAQ

Project Information

5 Q
The project “STATE ROUTE 1 (PACIFIC COAST HIGHWAY) DRAINAGE RESTORATION PROJECT AND BRIDGE REPLACEMENT AT SOLSTICE CANYON CREEK” is an infrastructure initiative in the Bridge sector, located in CA, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: California Description: The California Department of Transportation (Caltrans) proposes a drainage restoration project at nineteen (19) locations on State Route 1 (Pacific Coast Highway) in the cities of Los Angeles, Malibu, and unincorporated areas within Los Angeles County (post miles 37.67 to 62.86) and Ventura County (post miles 0.00 to 0.92). The proposed improvements include repair and rehabilitation of existing drainage facilities along the route to restore full functionality, to prevent further deterioration, and ensure proper drainage in an area subject to erosion. The proposed improvements also include the replacement of the existing bridge/culvert at Solstice Canyon Creek with a new bridge structure with an underlying natural slope creek bottom to provide improved flood water conveyance, and to improve hydraulic conditions to facilitate movement of the endangered Southern steelhead trout population in the project study area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data