State Route 1-Rock Slope Protection
Sector: Commercial • Location: CA, United States of America
Source: US Department of Transportation (USDOT)
Other Agencies with Actions or Authorizations: California Description: The purpose of the project is to perform permanent restoration of damage incurred by rigorous storm events. The slope has sustained severe surf erosion, which has undermined the roadway, and high intensity storms have resulted in cracks and displacements of the roadway shoulder. The construction of two secant walls at post mile
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Other Agencies with Actions or Authorizations: California Description: The purpose of the project is to perform permanent restoration of damage incurred by rigorous storm events. The slope has sustained severe surf erosion, which has undermined the roadway, and high intensity storms have resulted in cracks and displacements of the roadway shoulder. The construction of two secant walls at post miles 4.0 and 4.2 is proposed to provide adequate slope protection and stabilize the roadway. There are three alternatives for the project. In Alternative 1 – Cantilever Option, the secant walls are proposed to be constructed with 60” piles, and will not require slope excavation. In Alternative 2 – Ground Anchor Option, the two secant walls are proposed to be constructed with 42” piles and stabilized by anchors, requiring some slope excavation. Metal beam guardrails will be removed during construction and replaced with Midwest Guardrail system in both build alternatives. Alternative 3 is the No-Build Alternative, in which none of the proposed improvements would be constructed, and the stability of the roadway would remain unchanged. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
