State Route 1: Santa Maria River Bridge Replacement
Sector: Bridge • Location: CA, United States of America
Source: US Department of Transportation (USDOT)
Other Agencies with Actions or Authorizations: Department of Commerce, National Oceanic and Atmospheric Administration Department of the Interior, Fish and Wildlife Service Department of the Army, US Army Corps of Engineers - Regulatory California Description: The California Department of Transportation (Caltrans) proposes to replace the Santa Maria River Bridge (No. 49-0042) on State Route 1 (SR-
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Other Agencies with Actions or Authorizations: Department of Commerce, National Oceanic and Atmospheric Administration Department of the Interior, Fish and Wildlife Service Department of the Army, US Army Corps of Engineers - Regulatory California Description: The California Department of Transportation (Caltrans) proposes to replace the Santa Maria River Bridge (No. 49-0042) on State Route 1 (SR-1) at PM 50.3/50.6 in Santa Barbara County and at PM 0.0/0.3 in San Luis Obispo County. The Santa Maria River Bridge crosses the boundary of Santa Barbara County and San Luis Obispo County. As mentioned, the proposed project will occur on SR-1 in both northern Santa Barbara County and southern San Luis Obispo County. The bridge is located just north of the City of Guadalupe in Santa Barbara County. The 1,200 feet long bridge was built in 1955 and was seismically retrofitted in 1998. The existing bridge sections consist of two 12-foot lanes, two 2-foot shoulders and two 32-inch wide curbs supporting metal bridge rails. Multiple bridge inspections have determined that the bridge’s structural integrity has deteriorated and action is required to protect the traveling public. Temporary access will be required for bridge work and for work in the river. Vegetation removal will also be required. Construction equipment will need to operate in the riverbed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
