logo

State Route 120 Murphy Road Intersection Improvement Project

Sector: Power Transmission • Location: Manteca, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Phase 0 To Work On Project Approval & Environmental Document

This Safety Improvement project, the State Route 120 Intersection Control Improvement Project (project), is located in San Joaquin County on State Route (SR) 120 near Manteca at the intersection of Murphy Road. The intersection of SR 120 and Murphy Road is four-legged, with stop control access from Murphy Road and free-flow traffic on SR 120. The project proposes to reduce the number and severity

Project Information FAQ

Project Information

4 Q
The project “State Route 120 Murphy Road Intersection Improvement Project” is an infrastructure initiative in the Power Transmission sector, located in Manteca, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

phase 0 to work on project approval & environmental document

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This Safety Improvement project, the State Route 120 Intersection Control Improvement Project (project), is located in San Joaquin County on State Route (SR) 120 near Manteca at the intersection of Murphy Road. The intersection of SR 120 and Murphy Road is four-legged, with stop control access from Murphy Road and free-flow traffic on SR 120. The project proposes to reduce the number and severity of broadside collisions at this location by constructing intersection control improvements. Three design options were evaluated in the Project Initiation Document (PID) development process: a traffic signal, a roundabout, and All-Way-Stop-Control. The design option that will be evaluated as the build alternative in the Project Approval and Environmental Document phase (PA&ED) of the project is the Roundabout. This decision was made in the PID phase using data gained from the Intersection Control Evaluation (ICE) process. Furthermore, a No- Build Alternative will be carried through PA&ED. Additional right-of-way and utility relocation will be necessary. The project has been assigned a Project Development Category of 4B, indicating minimal economic, social, or environmental significance. It is included in the 2022 State Highway Operation and Protection Program (SHOPP) under the Safety Improvements Program (201.010) for delivery in Fiscal Year (FY) 2025/26.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data