logo

State Route 33 Intersection Improvement Project

Sector: Car parking • Location: Newman, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Construction Phase

The City of Newman was awarded project funding through RSTP and CMAQ programs for the ultimate build out of this project. After project funding was secured, the intersection underwent an evaluation process to determine the improvement alternative that best fit the project location. The alternatives evaluated included: Intersection signalization Construction of a single lane roundabout Maintaining

Project Information FAQ

Project Information

5 Q
The project “State Route 33 Intersection Improvement Project” is an infrastructure initiative in the Car parking sector, located in Newman, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction phase

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The City of Newman was awarded project funding through RSTP and CMAQ programs for the ultimate build out of this project. After project funding was secured, the intersection underwent an evaluation process to determine the improvement alternative that best fit the project location. The alternatives evaluated included: Intersection signalization Construction of a single lane roundabout Maintaining the existing stop sign controlled configuration The Intersection signalization alternative was selected as the best fit for the project location out of the 3 alternatives evaluated. The proposed RSTP project includes reconstruction and resurfacing of the existing roadway within the project limits and widening the intersection to allow for adequate truck turning movements. The project will also include installation of necessary underground conduits for future intersection control measures and coordination systems. Improvements include: Reconstruction of curb, gutter, sidewalk, and driveways on Highway 33. Construction of new curb, gutter, and sidewalk along Highway 33, South of the intersection. Reconstruction of the existing roadway Minor storm drains improvements Roadway striping and signage Installation of the traffic signal will occur in the future and will finish the ultimate build out of the intersection.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data