State Route 4 Culvert Replacement
Sector: Water Supply and Storage • Location: California, United States of America (USA)
Source: California Department of Transportation (Caltrans)
Caltrans proposes to rehabilitate or replace existing culverts on State Routes 4, 88, and 89 in Alpine County. Existing drainage systems at the proposed locations have exceeded their design life and have deteriorated or failed. Certain culverts would be replaced with the existing size, and others would be upsized to maintain the existing water flow capacity. The project would also upgrade or repla
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Caltrans proposes to rehabilitate or replace existing culverts on State Routes 4, 88, and 89 in Alpine County. Existing drainage systems at the proposed locations have exceeded their design life and have deteriorated or failed. Certain culverts would be replaced with the existing size, and others would be upsized to maintain the existing water flow capacity. The project would also upgrade or replace end treatments and headwalls as needed. To maintain and upgrade the existing facilities, work off the paved roadway, ground disturbance, work in the channel, and vegetation removal would be required. Permanent right-of-way acquisition, temporary construction easements, and work on federal lands would also be required. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America (USA)
- CNG Fueling at Hamilton Bus Facility
- Industrial wastewater treatment plant
- US 271 from FM 16 North to the Upshur County Line
- Memorial Drive from BW 8 to Tallowood Road
- SH 105 - I-45 to North Frazier Street -SH 75
- Water Treatment Plants Marana Water Treatment Campuses
- Chicago Riverwalk
- Pierce County Sewer and Traffic Operations Facility
