logo

State Route 4 Wagon Trail Realignment Project

Sector: Road • Location: Altaville (Angels Camp), California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
In Progress

The State Route 4 Realignment Project will improve the segment of State Route 4 from Bonanza Mine Way to Stockton Road from 2.6 miles east of Copperopolis to about 1.6 miles west of the State Route 4/49 junction in Altaville (Angels Camp), post miles 10.3 to 16.4, a total of about 6 miles. The project will construct a new alignment with two standard 12-foot width lanes and 8-foot paved shoulders.

Project Information FAQ

Project Information

5 Q
The project “State Route 4 Wagon Trail Realignment Project” is an infrastructure initiative in the Road sector, located in Altaville (Angels Camp), California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The State Route 4 Realignment Project will improve the segment of State Route 4 from Bonanza Mine Way to Stockton Road from 2.6 miles east of Copperopolis to about 1.6 miles west of the State Route 4/49 junction in Altaville (Angels Camp), post miles 10.3 to 16.4, a total of about 6 miles. The project will construct a new alignment with two standard 12-foot width lanes and 8-foot paved shoulders. The project would improve sight distance by increasing curve radii with the incorporation of longer, smoother curves. The project will be constructed in phases, and based on accident data, the 2-mile segment between Bonanza Mine Way and Appaloosa Road (Phase 1 – Westerly Segment) was identified to have the highest priority.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data