logo

State Route 59 Capital Preventive Maintenance Project

Sector: Road • Location: Merced, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Project Study Report Approved 6/28/2021.

The proposed project is a Capital Preventive Maintenance (CAPM) to preserve and extend the pavement service life within the project limits. The project is located on State Route (SR) 59, in Merced County, in the City of Merced from 0.20 mile south of SR 59 and W Childs Ave intersection (PM 14.1) to the intersection of SR 59 and SR 99 (PM 14.763) continuing from the intersection of SR 59 and SR 99

Project Information FAQ

Project Information

5 Q
The project “State Route 59 Capital Preventive Maintenance Project” is an infrastructure initiative in the Road sector, located in Merced, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project study report approved 6/28/2021.

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is a Capital Preventive Maintenance (CAPM) to preserve and extend the pavement service life within the project limits. The project is located on State Route (SR) 59, in Merced County, in the City of Merced from 0.20 mile south of SR 59 and W Childs Ave intersection (PM 14.1) to the intersection of SR 59 and SR 99 (PM 14.763) continuing from the intersection of SR 59 and SR 99 on V St (PM 14.78) to 0.10 mile north of South Fork Black Rascal Creek near Santa Fe Drive intersection (PM 16.3). The scope of the work includes cold planning existing pavement, dig-outs to repair localized areas of severe failure, sealing cracks, repair, replace and upgrade AC dikes and curbs, adding shoulder backing, upgrading Americans with Disabilities Act (ADA) ramps, replacement of existing drainage grates with bicycle proof grates where needed, and signal work at 3 intersections: (15th St (ED023), 16th St (ED003) and Santa Fe Drive/Olive Ave (ED004) intersections with SR 59.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data