State Route 89A Guardrail Replacement Project
One of 10,000+ projects Taiyo tracks in Arizona.
Source: Arizona Daily Sun
The Arizona Department of Transportation is conducting a guardrail replacement project along State Route 89A's switchbacks at the north end of Oak Creek Canyon. The project involves lane restrictions with temporary traffic signals allowing one-directional travel through the work zone.
- Status
- Under Construction
- Sector
- Transport
- Location
- Flagstaff, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Arizona Daily Sun
ConstructChat
Ask ConstructChat about State Route 89A Guardrail Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Arizona Department of Transportation is conducting a guardrail replacement project along State Route 89A's switchbacks at the north end of Oak Creek Canyon. The project involves lane restrictions with temporary traffic signals allowing one-directional travel through the work zone. |
Original sector | Transport |
Location
Country | United States of America (USA) |
State | Arizona |
City | Flagstaff |
Source
Source | Arizona Daily Sun |
URL |
More Details
Record type | Project |
Article published date | 2026-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
