State Route 99 Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The State Route 99 Rehabilitation from El Dorado Street to Clinton Ave project will reconstruct 3.2 miles of roadway with concrete pavement and alleviate road traffic backups through downtown Fresno with improved interchange configurations, added auxiliary lanes, and increased shoulder widths.
- Status
- Prospective
- Sector
- Cement, Manufacturing (Industrial), Road, Commercial
- Location
- Fresno, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about State Route 99 Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The State Route 99 Rehabilitation from El Dorado Street to Clinton Ave project will reconstruct 3.2 miles of roadway with concrete pavement and alleviate road traffic backups through downtown Fresno with improved interchange configurations, added auxiliary lanes, and increased shoulder widths. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fresno |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Manufacturing (Industrial), Road, Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
