State Street Culvert Replacement
Sector: Water Supply and Storage • Location: Oldsmar, Florida, United States of America
Source: Dodge
State Street between Clarendon St. and Lafayette Blvd. has a large ditch along the Northeast side of the road. At present, the culverts under the driveways create constrictions which cause erosion of the open ditch segments. This project will replace the existing ditch with a continous box culvert, and to provide fill to the roadway grade.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
- Location
- Oldsmar, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about State Street Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | State Street between Clarendon St. and Lafayette Blvd. has a large ditch along the Northeast side of the road. At present, the culverts under the driveways create constrictions which cause erosion of the open ditch segments. This project will replace the existing ditch with a continous box culvert, and to provide fill to the roadway grade. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Oldsmar |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
