State Street Culvert Replacement
Sector: Road • Location: Oldsmar, Florida, United States of America
Source: Dodge USA
State Street between Clarendon St. and Lafayette Blvd. has a large ditch along the Northeast side of the road. At present, the culverts under the driveways create constrictions which cause erosion of the open ditch segments. This project will replace the existing ditch with a continous box culvert, and to provide fill to the roadway grade.
- Status
- Prospective
- Sector
- Road, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
- Location
- Oldsmar, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about State Street Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | State Street between Clarendon St. and Lafayette Blvd. has a large ditch along the Northeast side of the road. At present, the culverts under the driveways create constrictions which cause erosion of the open ditch segments. This project will replace the existing ditch with a continous box culvert, and to provide fill to the roadway grade. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Oldsmar |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
