logo

Stateline Avenue Complete Streets Project

Sector: Road • Location: South Lake Tahoe, California, United States of America

Source: Dodge USA

Project
Closed

consultants to advance the conceptual planning and determine a feasible engineering design for the Stateline Avenue Complete Streets Project. The work shall include all tasks associated with conceptual planning and engineering to develop a preferred alternative for the circulation study zone and complete streets layout for Stateline Avenue from Hwy 50 to Lakeshore Blvd. Services shall include, but

Status
Closed
Sector
Road, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
Location
South Lake Tahoe, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Stateline Avenue Complete Streets Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Stateline Avenue Complete Streets Project” is an infrastructure initiative in the Road sector, located in South Lake Tahoe, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

consultants to advance the conceptual planning and determine a feasible engineering design for the Stateline Avenue Complete Streets Project. The work shall include all tasks associated with conceptual planning and engineering to develop a preferred alternative for the circulation study zone and complete streets layout for Stateline Avenue from Hwy 50 to Lakeshore Blvd. Services shall include, but are not limited to project management, public and stakeholder outreach, traffic analysis, parkin...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

South Lake Tahoe

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project