Station 1 Reconstruction
Closed · Missouri · Last reported Jun 2024
Source: Dodge USA
The services to be provided include: 1. HVAC The HVAC system shall be completed in its entirety. New supply and return ducting shall be insulated to a minimum of R-8. An Aprilaire PRO E100 dehumidification system shall be installed at the AHU of the HVAC system. Bathroom exhaust fan shall be ducted to the exterior of the addition. 2. Electric & Plumbing Complete the rough-in electric on the mezzan
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
- Location
- Lake Ozark, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Station 1 Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The services to be provided include: 1. HVAC The HVAC system shall be completed in its entirety. New supply and return ducting shall be insulated to a minimum of R-8. An Aprilaire PRO E100 dehumidification system shall be installed at the AHU of the HVAC system. Bathroom exhaust fan shall be ducted to the exterior of the addition. 2. Electric & Plumbing Complete the rough-in electric on the mezzanine side of the addition. The exhaust fan and lighting circuits in the addition bathroom shall be... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Lake Ozark |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
