Station 5 Pump Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project includes the replacement of the 2 (two) existing submersible wet well pumps including all electrical, MCC replacement, piping modifications, installation of new pump rails and access ladder rungs. This repair will require coordination with Municipal Operations staff to ensure the station flow is maintained during installation works.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Generation (CCGT), Rail, Commercial, Waste Processing and Treatment
- Location
- Meaford, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Station 5 Pump Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the replacement of the 2 (two) existing submersible wet well pumps including all electrical, MCC replacement, piping modifications, installation of new pump rails and access ladder rungs. This repair will require coordination with Municipal Operations staff to ensure the station flow is maintained during installation works. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Meaford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Generation (CCGT), Rail, Commercial, Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
