logo
ProjectIn Progress

Station Access and Safety Project

One of 10,000+ projects Taiyo tracks in British Columbia.

Source: Infrastructure Canada

This project will improve station systems and infrastructure on the SkyTrain network to meet safety, access/egress, and operational requirements. As part of its 10-Year Investment Plan, TransLink has initiated an expansion of the Expo and Millennium stations to support larger 5-car trains (being acquired under the Expo and Millenium Upgrade Program), which can transport larger volumes of riders. T

Status
Under Construction
Sector
Rail, Government, Automotive
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Station Access and Safety Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Station Access and Safety Project” is an infrastructure initiative in the Rail sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will improve station systems and infrastructure on the SkyTrain network to meet safety, access/egress, and operational requirements. As part of its 10-Year Investment Plan, TransLink has initiated an expansion of the Expo and Millennium stations to support larger 5-car trains (being acquired under the Expo and Millenium Upgrade Program), which can transport larger volumes of riders. These longer 85 metre trains and the corresponding increase in ridership exceed the capacity of many stations in the network with 80 metre platforms. The Station Access and Safety Project (SASP) will address critical safety and access risks at and around stations. The scope of this project includes the rehabilitation and expansion of station components as follows: - Modify the Guideway Intrusion Monitoring System where it would be blocked by the new trains to maintain capacity to detect individuals accessing the guideway (approximately 52 platforms in 27 stations); - Extend guideway walkways that would be blocked by the 5-car trains to allow attendant access (approximately 31 guideway walkways in 16 stations); - Modify Automatic Train Control systems which would be blocked by the longer 5-car trains; - Add infrastructure (e.g. additional stairs) where required to ensure stations can meet TransLink’s 4-minute standard for emergency egress given greater passenger loading of 5-car trains; and - Modify approximately 50 platforms in 25 stations to reduce gaps in compliance with TransLink standards for riders with disabilities. The project also includes technical and system integration to ensure the trains can operate within the stations. The Project is critical to safely operate longer trains on the SkyTrain network.

Original sector

Public Transit

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Rail, Government, Automotive

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project