Station Access and Safety Project
Sector: Rail • Location: British Columbia, Canada
Source: Infrastructure Canada
This project will improve station systems and infrastructure on the SkyTrain network to meet safety, access/egress, and operational requirements. As part of its 10-Year Investment Plan, TransLink has initiated an expansion of the Expo and Millennium stations to support larger 5-car trains (being acquired under the Expo and Millenium Upgrade Program), which can transport larger volumes of riders. T
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will improve station systems and infrastructure on the SkyTrain network to meet safety, access/egress, and operational requirements. As part of its 10-Year Investment Plan, TransLink has initiated an expansion of the Expo and Millennium stations to support larger 5-car trains (being acquired under the Expo and Millenium Upgrade Program), which can transport larger volumes of riders. These longer 85 metre trains and the corresponding increase in ridership exceed the capacity of many stations in the network with 80 metre platforms. The Station Access and Safety Project (SASP) will address critical safety and access risks at and around stations. The scope of this project includes the rehabilitation and expansion of station components as follows: - Modify the Guideway Intrusion Monitoring System where it would be blocked by the new trains to maintain capacity to detect individuals accessing the guideway (approximately 52 platforms in 27 stations); - Extend guideway walkways that would be blocked by the 5-car trains to allow attendant access (approximately 31 guideway walkways in 16 stations); - Modify Automatic Train Control systems which would be blocked by the longer 5-car trains; - Add infrastructure (e.g. additional stairs) where required to ensure stations can meet TransLink’s 4-minute standard for emergency egress given greater passenger loading of 5-car trains; and - Modify approximately 50 platforms in 25 stations to reduce gaps in compliance with TransLink standards for riders with disabilities. The project also includes technical and system integration to ensure the trains can operate within the stations. The Project is critical to safely operate longer trains on the SkyTrain network. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
