Pipe rehabilitation from Manhole 167 (Hornak Rd.) to Manhole 53 (Forest Ave.) The total proposed works are for the construction and installation of a structural liner, grouting, and miscellaneous service repairs in the road allowance. This is a recommended ’no-dig’ solution that reduces the impact to the area and reduces impact to the environment. The proposed works on the sewer main are also in p

Status
Closed
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Station Street Lateral Assessments and Pipe Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Station Street Lateral Assessments and Pipe Rehabilitation” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Pipe rehabilitation from Manhole 167 (Hornak Rd.) to Manhole 53 (Forest Ave.) The total proposed works are for the construction and installation of a structural liner, grouting, and miscellaneous service repairs in the road allowance. This is a recommended ’no-dig’ solution that reduces the impact to the area and reduces impact to the environment. The proposed works on the sewer main are also in preparation for a future project to remove inflow in this critical area. These works will be part of a series of works needed in order to achieve an ultimate goal of Ministry of Environment and Climate Change (MOECC) F-5-5 compliance. The structural liners are expected to add approximately 50 years to the life expectancy of the sewers. In 2014-2015 the township completed an Inflow and Infiltration Flow Monitoring and a closed-circuit television (CCTV) study on its existing sanitary sewer system. The study identified key areas of sanitary sewer where deficiencies were identified including high levels of infiltration during peak wet weather events. This included sewers on Station Street, Colver Street, and Wade Road. The study noted high level event coefficient of variation (CV) of up to 15.5%, or severe. The study recommends that the areas are critical and need to be considered a priority. Additional CCTV inspections confirmed multiple sources of infiltration, including cracks, displaced joints, and infiltration gushers. A review of the sewer deficiencies determined that a full structural and service repairs within the road allowance is the best approach.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project