logo

STC - Sistema de Transmissão Catarinense

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

In november 2005 , Alusa Engenharia Ltda, was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 195-km transmission line located in the state of Santa Catarina (Barra Grande – Lajes-Rio do Sul). Besides Alusa Engenharia Ltda, eight other companies took part in the contest: CONSÓRCIO CME - EFACEC; state-owned company CEMI

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about STC - Sistema de Transmissão Catarinense

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “STC - Sistema de Transmissão Catarinense” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In november 2005 , Alusa Engenharia Ltda, was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 195-km transmission line located in the state of Santa Catarina (Barra Grande – Lajes-Rio do Sul). Besides Alusa Engenharia Ltda, eight other companies took part in the contest: CONSÓRCIO CME - EFACEC; state-owned company CEMIG; ABENGOA S.A.; CONSÓRCIO CURUPIRA; CONSÓRCIO BANDEIRANTE; ISA - INTERCONEXIÓN ELÉCTRICA S.A. E.S.P.; and ELECNOR S.A. The bidding criteria set by ANEEL was the lowest required annual revenue. Alusa Engenharia Ltda. presented the lowest offer, a total value of US$ 8.16 million (BRL 17.79 million), 41.44% below the ceiling set by the regulatory agency. The contract was signed in April 2006, and the sponsors created the company Sistema de Transmissão Catarinense S.A. to lead the project during the 30-year contract period. The sponsor committed US$ 86.1 million (BRL 167.8 million) in the transmission line. Financial closure was achieved in October 2007, when the sponsor was granted a US $ 63.7 million (BRL 124.3 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. In October 2008, 80% of the shares in the project company was transferred to the company Empresa Amazonense de Transmissão de Energia S.A., whose shareholding structure was the following: the state-owned company Cemig held 49.99% of the shares, while Alusa held 50.01%.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Government, Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project