Stead Golf Course Main Replacement
One of 10,000+ projects Taiyo tracks in Nevada.
Source: Dodge USA
The project consists of replacement of about 10,000 linear feet of 14-inch steel pipe installed around 1945. The pipe provides an important hydraulic tie between the Stead tanks and the northeast extremities of the Stead distribution system. The pipeline may also be useful to alleviate an existing bottleneck between the Stead wells and the distribution system.
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Government, Metal, Commercial, Fertilizers, Raw Materials
- Location
- Reno, Nevada, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Stead Golf Course Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project consists of replacement of about 10,000 linear feet of 14-inch steel pipe installed around 1945. The pipe provides an important hydraulic tie between the Stead tanks and the northeast extremities of the Stead distribution system. The pipeline may also be useful to alleviate an existing bottleneck between the Stead wells and the distribution system. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Reno |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Metal, Commercial, Fertilizers, Raw Materials |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
