Steam & Condensate Utility Replacement REBID
Sector: Water Supply and Storage • Location: Milwaukee, Wisconsin, United States of America
Source: Dodge USA
Scope - In general, the work consists of: replacing approximately 350 lineal feet of existing steam box conduit from the utility tunnel to Merrill Hall and 200 lineal feet of steam box conduit from the utility tunnel to Norris Hall. Existing utility tunnel and mechanical room piping will be modified to incorporate new direct buried conduit systems. Design services for Concrete Box Conduit & Utilit
- Status
- Closed
- Sector
- Water Supply and Storage, Tunnel, Commercial, Cement, Raw Materials, Fertilizers, Power Transmission, Power Generation (CCGT)
- Location
- Milwaukee, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Steam & Condensate Utility Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - In general, the work consists of: replacing approximately 350 lineal feet of existing steam box conduit from the utility tunnel to Merrill Hall and 200 lineal feet of steam box conduit from the utility tunnel to Norris Hall. Existing utility tunnel and mechanical room piping will be modified to incorporate new direct buried conduit systems. Design services for Concrete Box Conduit & Utility Pit Replacement. Project work includes refurbishing one steam pit and one piping intersection a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Milwaukee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Tunnel, Commercial, Cement, Raw Materials, Fertilizers, Power Transmission, Power Generation (CCGT) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
