Steam Tunnel Repairs REBID
Sector: Power Transmission • Location: Oshkosh, Wisconsin, United States of America
Source: Dodge USA
Remove and replace approximately 130 of concrete steam 33 tunnel lid and new manhole access cover and install new insulated and waterproof 34 concrete lid in same location. In addition, install new protective and removable steel pipe 35 bollards to minimize damage from heavy vehicle traffic over tunnel. Project also includes 36 new steel steam pipe supports brackets secured to existing tunnel wall
- Status
- Closed
- Sector
- Power Transmission, Steel, Cement, Tunnel, Automotive, Government, Metal, Commercial, Fertilizers, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Oshkosh, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Steam Tunnel Repairs REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove and replace approximately 130 of concrete steam 33 tunnel lid and new manhole access cover and install new insulated and waterproof 34 concrete lid in same location. In addition, install new protective and removable steel pipe 35 bollards to minimize damage from heavy vehicle traffic over tunnel. Project also includes 36 new steel steam pipe supports brackets secured to existing tunnel walls. Work to be done 37 in Summer 2022. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Oshkosh |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Steel, Cement, Tunnel, Automotive, Government, Metal, Commercial, Fertilizers, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
