logo

STEEL-COSIPA II

Sector: Manufacturing (Industrial) • Location: Brazil

Source: World Bank Group

Project
Closed

The proposed expansion of COSIPA's facilities would increase production from about 2.3 to 3.5 million metric tons of raw steel per year to produce about 2.8 million tons of flat products. The new facilities will include a new pier and additional loading and unloading facilities; additional raw materials handling equipment; a third sinter plant; a second BOF shop with two 120-ton vessels and two co

Project Information FAQ

Project Information

5 Q
The project “STEEL-COSIPA II” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed expansion of COSIPA's facilities would increase production from about 2.3 to 3.5 million metric tons of raw steel per year to produce about 2.8 million tons of flat products. The new facilities will include a new pier and additional loading and unloading facilities; additional raw materials handling equipment; a third sinter plant; a second BOF shop with two 120-ton vessels and two continuous slab casting machines; remotoring of the finishing stands of the hot strip mill; an additional slab reheat furnace for the 4,100 mm plate mill together with an additional cooling bed and normalizing furnace; a new pickling line; a new 5-stand tandem cold reduction mill; a new temper mill; lines for coil inspection, shearing and electrolytic cleaning; and associated maintenance and auxiliary facilities, including a new roll shop for the cold mill, high and low pressure boilers, one turbo-generator with substation and a fourth oxygen plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data