STEEL-CSN II
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project would expand CSN's production facilities from about 2.4 to 4.4 million metric tons of raw steel per year to produce about 3.5 million tons of flat and non-flat steel products. The new facilities will include two calcining plants, two batteries of coke ovens, a large sinter plant and an oxygen plant, a 200 ton BOF vessel, one continuous 66 inch hot strip mill, a plate finishing line, tw
- Status
- Closed
- Sector
- Energy Storage, Manufacturing (Industrial), Steel, Metal, Rail, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about STEEL-CSN II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would expand CSN's production facilities from about 2.4 to 4.4 million metric tons of raw steel per year to produce about 3.5 million tons of flat and non-flat steel products. The new facilities will include two calcining plants, two batteries of coke ovens, a large sinter plant and an oxygen plant, a 200 ton BOF vessel, one continuous 66 inch hot strip mill, a plate finishing line, two continuous 1.1 million TPY pickling lines, a 66 inch six stand tandem cold strip mill, batch and continuous annealing facilities, two temper mills, two cold strip finishing lines, a continuous 180,000 TPY galvanizing line, a painting line, a coil preparation line, two electrolytic tinning lines, two roll shops, railroad facilities and equipment and expansion of CSN's mining operations to 9.2 million tons per year of ore. |
Original sector | (Historic)Industry |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Manufacturing (Industrial), Steel, Metal, Rail, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Brazil
- CPFL Renovaveis Bio Alvorada & Bio Coopcana Biomass Plants
- Lithium Project in Brazil
- Santa Cruz Graphite Mine Production and Shipment
- Neves Lithium Project
- Altmin Lithium Refining Project in Brazil
- CPFL Iron-Air Battery Pilot Project
- Brazil's Battery Energy Storage System Auction
- Renewable Energy Integration Program for the Northeast of Brazil
