logo
ProjectAwarded

Steel Hawk Data Centre Power Supply Project

The status, timeline and source of this project. A free account opens every field.

Source: NST Online

Steel Hawk Engineering secured a RM35.04 million contract to establish a 275kV power supply connection to a data centre. The project is scheduled from November 2025 to July 2026 and is expected to positively impact the company's 2025 earnings.

Status
Closed
Sector
Steel, Data Center, Power Generation (CCGT), Metal
Location
Malaysia
Updated
22 Jul 2026
Source
NST Online

ConstructChat

Ask ConstructChat about Steel Hawk Data Centre Power Supply Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Steel Hawk Data Centre Power Supply Project” is an infrastructure initiative in the Steel sector, located in Malaysia. Taiyo aggregates data on it from NST Online.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Steel Hawk Engineering secured a RM35.04 million contract to establish a 275kV power supply connection to a data centre. The project is scheduled from November 2025 to July 2026 and is expected to positively impact the company's 2025 earnings.

Original sector

Energy Infrastructure

Budget

Location

Country

Malaysia

Source

Source

NST Online

URL

More Details

Record type

Project

Sector

Steel, Data Center, Power Generation (CCGT), Metal

Article published date

2025-11-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project