Steel Hawk Data Centre Power Supply Project
Awarded · Malaysia · Last reported Nov 2025
Source: NST Online
Steel Hawk Engineering secured a RM35.04 million contract to establish a 275kV power supply connection to a data centre. The project is scheduled from November 2025 to July 2026 and is expected to positively impact the company's 2025 earnings.
- Status
- Closed
- Sector
- Steel, Data Center, Power Generation (CCGT), Metal
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- NST Online
ConstructChat
Ask ConstructChat about Steel Hawk Data Centre Power Supply Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Steel Hawk Engineering secured a RM35.04 million contract to establish a 275kV power supply connection to a data centre. The project is scheduled from November 2025 to July 2026 and is expected to positively impact the company's 2025 earnings. |
Original sector | Energy Infrastructure |
Budget |
Location
Country | Malaysia |
Source
Source | NST Online |
URL |
More Details
Record type | Project |
Sector | Steel, Data Center, Power Generation (CCGT), Metal |
Article published date | 2025-11-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
