Steel River Energy Center Phases 1 and 2
The owner, status and timeline of this project. A free account opens every field.
Source: ConstructConnect News
Cypress Creek Energy and Google broke ground on the first two phases of the Steel River Energy Center in Arkansas, the largest American solar energy project to date. The phases will add 1.6 GWdc of solar generation and 1.9 GWh of battery storage, requiring over 400,000 steel piles and more than 142,000 tons of steel from U.S. Steel’s Big River facility.
- Status
- Under Construction
- Sector
- Energy Storage, Steel, Solar
- Location
- Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- ConstructConnect News
ConstructChat
Ask ConstructChat about Steel River Energy Center Phases 1 and 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cypress Creek Energy and Google broke ground on the first two phases of the Steel River Energy Center in Arkansas, the largest American solar energy project to date. The phases will add 1.6 GWdc of solar generation and 1.9 GWh of battery storage, requiring over 400,000 steel piles and more than 142,000 tons of steel from U.S. Steel’s Big River facility. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | ConstructConnect News |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Steel, Solar |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States
- Tampa Bay Seawater Desalination Plant
- Centrally Managed Pay-and-Display Parking
- Chevron Richmond Refinery
- Nestle Food and Distribution Centre, USA
- Pepperidge Farm Bakery Plant
- Baldock Solar Highway
- Doyle Drive Replacement / Presidio Parkway, San Francisco, US
- Newtown Creek (35-G) North and North Central Batteries
