Steele Ditch
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Contractor shall perform everything required to be performed and shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required for the STEELE DITCH #23-04
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Power Transmission, Power Generation (CCGT), Metal
- Location
- Defiance, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Steele Ditch
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall perform everything required to be performed and shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required for the STEELE DITCH #23-04 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Defiance |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Power Transmission, Power Generation (CCGT), Metal |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
