logo

Steelton Terminal Warehouse 3

Sector: Water Supply and Storage • Location: Lower Swatara Township, Pennsylvania, United States of America

Source: Dodge

Project
Design Development

Building three would include 305,760 square feet of space and would be located in all three townships. The 137.01-acre project site is split among three (3) municipalities: Lower Swatara Township, Steelton Borough, and Swatara Township. access roads/drives, parking areas, site improvements, utilities, and stormwater/PCSM facilities

Status
Prospective
Sector
Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment, Warehouse, Power Transmission, Car parking, Power Generation (CCGT), Automotive
Location
Lower Swatara Township, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Steelton Terminal Warehouse 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Steelton Terminal Warehouse 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Lower Swatara Township, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Design Development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Building three would include 305,760 square feet of space and would be located in all three townships. The 137.01-acre project site is split among three (3) municipalities: Lower Swatara Township, Steelton Borough, and Swatara Township. access roads/drives, parking areas, site improvements, utilities, and stormwater/PCSM facilities

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Lower Swatara Township

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment, Warehouse, Power Transmission, Car parking, Power Generation (CCGT), Automotive

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project