logo
ProjectUnder Construction

Stegra Hydrogen-based DRI-EAF Plant

Under construction · Sweden · Last reported Dec 2026

Source: GMK Center

Stegra is building a 2.5-million-ton hydrogen-based direct reduced iron (DRI) and electric arc furnace (EAF) plant, the most ambitious hydrogen metallurgy project in Europe. The first phase is nearing completion with commissioning scheduled for late 2026.

Status
Under Construction
Sector
Metal, Hydrogen, Steel, Government, Commercial, Residential
Location
Boden, Sweden
Updated
22 Jul 2026
Source
GMK Center

ConstructChat

Ask ConstructChat about Stegra Hydrogen-based DRI-EAF Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Stegra Hydrogen-based DRI-EAF Plant” is an infrastructure initiative in the Metal sector, located in Boden, Sweden. Taiyo aggregates data on it from GMK Center.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Stegra is building a 2.5-million-ton hydrogen-based direct reduced iron (DRI) and electric arc furnace (EAF) plant, the most ambitious hydrogen metallurgy project in Europe. The first phase is nearing completion with commissioning scheduled for late 2026.

Original sector

Energy and Steel Production

Location

Country

Sweden

City

Boden

Source

Source

GMK Center

URL

More Details

Record type

Project

Sector

Metal, Hydrogen, Steel, Government, Commercial, Residential

Article published date

2026-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project