Stephanie Campus Automotive New Trailer
Sector: Automotive • Location: Las Vegas, Nevada, United States of America
Source: Dodge USA
The Work consists of the construction of Off-site and On-site wet and dry utility connections, domestic water, sanitary sewer, electrical, low voltage, central HVAC Controls, Access Controls, Site improvements, including but not limited to new asphalt paving for an open area for parking and yard storage, vehicular roadways, signage and wayfinding, installation of a new site perimeter chain-link fe
- Status
- Closed
- Sector
- Automotive, Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Power Generation (CCGT), Mass Transit, Government, Rail, Commercial
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Stephanie Campus Automotive New Trailer
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of the construction of Off-site and On-site wet and dry utility connections, domestic water, sanitary sewer, electrical, low voltage, central HVAC Controls, Access Controls, Site improvements, including but not limited to new asphalt paving for an open area for parking and yard storage, vehicular roadways, signage and wayfinding, installation of a new site perimeter chain-link fence, site lighting, and associated onsite electrical and low voltage/ communication distribution ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Power Generation (CCGT), Mass Transit, Government, Rail, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
