Stephen Subdivision Phase I
Closed · Illinois · Last reported Jun 2024
Source: Dodge USA
The Project consists of grading the subgrade, construction of an Aggregate Base 10" in depth, grading the roadside ditches, installation of storm sewers and inlets, installation of a 36 IN pipe culvert and riprap in the drainage ditch, re-grading the drainage ditch, seeding and all other items as shown in the contract documents.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Marshall, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Stephen Subdivision Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of grading the subgrade, construction of an Aggregate Base 10" in depth, grading the roadside ditches, installation of storm sewers and inlets, installation of a 36 IN pipe culvert and riprap in the drainage ditch, re-grading the drainage ditch, seeding and all other items as shown in the contract documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Marshall |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
