Sterling C Robertson Dam New Administrative Complex
Sector: Residential • Location: Thornton, Texas, United States of America
Source: Dodge USA
The existing administrative complex, constructed at Lake Limestone in the late 1978, has aged over the past 40 years. The growth of Lake Limestone and its staff has also grown to a level that insufficient workspace is available for daily operation for lake staff. This project includes a needs assessment of the current structures and a feasibility study/initial design to determine the site, size, a
- Status
- Prospective
- Sector
- Residential, Hydro, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Thornton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sterling C Robertson Dam New Administrative Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing administrative complex, constructed at Lake Limestone in the late 1978, has aged over the past 40 years. The growth of Lake Limestone and its staff has also grown to a level that insufficient workspace is available for daily operation for lake staff. This project includes a needs assessment of the current structures and a feasibility study/initial design to determine the site, size, and estimated cost to build a new administrative complex or add additional structures to the curre... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Thornton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Hydro, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- CR 649/PLEASANT HOME RD @ CSX RR/ID 633746U
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- CUMBERLAND MULTI-MODAL PATH - SEGMENT E
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
