Stewart Rd (8th St) White River Bridge
Closed · Washington · Last reported Nov 2024
Source: Dodge USA
The project consists of the bridge crossing the White River within the Stewart Road SE, Butte Avenue SE, 140th Avenue Court E, and 140th Avenue E right-of-way and easements in the cities of Sumner and Pacific, and Pierce County. This work includes the demolition of the existing bridge structure; demolition of existing building structures; construction of a new, widened bridge structure with shared
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Mass Transit, Rail, Bridge, Commercial, Car parking, Road, Waste Processing and Treatment, Automotive
- Location
- Sumner, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Stewart Rd (8th St) White River Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the bridge crossing the White River within the Stewart Road SE, Butte Avenue SE, 140th Avenue Court E, and 140th Avenue E right-of-way and easements in the cities of Sumner and Pacific, and Pierce County. This work includes the demolition of the existing bridge structure; demolition of existing building structures; construction of a new, widened bridge structure with shared use path; removal and reconstruction of the east side levee; storm drainage piping, structures, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Sumner |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Mass Transit, Rail, Bridge, Commercial, Car parking, Road, Waste Processing and Treatment, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
