Stewart Road Culvert Replacement
Sector: Water Supply and Storage • Location: Dane, Wisconsin, United States of America
Source: Dodge USA
The Project includes the following Work: 200 LF of Town road reconstruction for stormwater structure replacement including clearing and grubbing, removing existing structure, installation of a 72-inch CMP culvert with end sections, structure backfill, base aggregate, traffic control, riprap, geotextile fabric, salvaged topsoil and restoration.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project includes the following Work: 200 LF of Town road reconstruction for stormwater structure replacement including clearing and grubbing, removing existing structure, installation of a 72-inch CMP culvert with end sections, structure backfill, base aggregate, traffic control, riprap, geotextile fabric, salvaged topsoil and restoration. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
