logo

StFX Varsity Drive Residences

Sector: Commercial • Location: Canada

Source: Bird Construction

Project
Unknown

The new residences at St. Francis Xavier University are unique in their design as they have been configured into two curved and mirrored wings that together form a semicircle. Each building is capped with a 50-foot copper dome tower. The 360-bed student residences are targeting LEED® Gold certification. The buildings are unique in the fact that they use fish oil heating combined with a geothermal

Project Information FAQ

Project Information

4 Q
The project “StFX Varsity Drive Residences” is an infrastructure initiative in the Commercial sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new residences at St. Francis Xavier University are unique in their design as they have been configured into two curved and mirrored wings that together form a semicircle. Each building is capped with a 50-foot copper dome tower. The 360-bed student residences are targeting LEED® Gold certification. The buildings are unique in the fact that they use fish oil heating combined with a geothermal system to distribute heating and cooling through in-floor distribution. Ceiling heights have also been maximized by distributing air through a rooftop spine network of ducts with vertical branch supply. The new residence has been designed in-house by Bird’s design team using building information modeling (BIM) 3D software. The use of BIM as part of an integrated design approach has been helpful in managing the design process and avoiding costly architectural, mechanical and structural interferences during construction. In addition, the ability to accurately integrate mechanical distribution during the design phase enabled the team to maximize floor areas by reducing unnecessary service chases and wall thickness, which in turn, reduced the building’s height, footprint and construction costs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data