StFX Varsity Drive Residences
Sector: Commercial • Location: Canada
Source: Bird Construction
The new residences at St. Francis Xavier University are unique in their design as they have been configured into two curved and mirrored wings that together form a semicircle. Each building is capped with a 50-foot copper dome tower. The 360-bed student residences are targeting LEED® Gold certification. The buildings are unique in the fact that they use fish oil heating combined with a geothermal
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unknown |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The new residences at St. Francis Xavier University are unique in their design as they have been configured into two curved and mirrored wings that together form a semicircle. Each building is capped with a 50-foot copper dome tower. The 360-bed student residences are targeting LEED® Gold certification. The buildings are unique in the fact that they use fish oil heating combined with a geothermal system to distribute heating and cooling through in-floor distribution. Ceiling heights have also been maximized by distributing air through a rooftop spine network of ducts with vertical branch supply. The new residence has been designed in-house by Bird’s design team using building information modeling (BIM) 3D software. The use of BIM as part of an integrated design approach has been helpful in managing the design process and avoiding costly architectural, mechanical and structural interferences during construction. In addition, the ability to accurately integrate mechanical distribution during the design phase enabled the team to maximize floor areas by reducing unnecessary service chases and wall thickness, which in turn, reduced the building’s height, footprint and construction costs. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
