STH 28 Force Main & Water Extension
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
In general, the project consists of force main and water main construction along STH 28 in the Village of Cascade, Sheboygan County. The improvements include but are not limited to 980 lineal of small diameter force main installed via horizontal directional drilling, 1,025 lineal feet of water main, turf replacement, and related items
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Raw Materials, Government
- Location
- Cascade, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about STH 28 Force Main & Water Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the project consists of force main and water main construction along STH 28 in the Village of Cascade, Sheboygan County. The improvements include but are not limited to 980 lineal of small diameter force main installed via horizontal directional drilling, 1,025 lineal feet of water main, turf replacement, and related items |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Cascade |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Raw Materials, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
