STOCKBRIDGE DOWNTOWN STREETSCAPE
Sector: Consumer Products • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed project is to be built using Transportation Enhancement funds and local funds. The project is described as streetscape improvements along Berry Street, beginning at Nolan Street and extending approximately 1300' north to Love Street Berry Street. The improvements include concrete sidewalks, decorative brick inserts, handicap access ramps, lighting, signage, street furniture, street tr
- Status
- Closed
- Sector
- Consumer Products, Cement, Road, Car parking, Government, Automotive, Waste Processing and Treatment
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about STOCKBRIDGE DOWNTOWN STREETSCAPE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project is to be built using Transportation Enhancement funds and local funds. The project is described as streetscape improvements along Berry Street, beginning at Nolan Street and extending approximately 1300' north to Love Street Berry Street. The improvements include concrete sidewalks, decorative brick inserts, handicap access ramps, lighting, signage, street furniture, street trees, landscaping, improved pedestrian crossings, new asphalt pavement, pavement striping and drainage improvements. The pedestrian improvements will require storm drainage modifications to the existing storm system located at the intersection of South Berry Street and Nolan Street. All work will comply with ADA requirements. Pedestrian light poles will have a breakaway design. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Cement, Road, Car parking, Government, Automotive, Waste Processing and Treatment |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
