logo

STOCKTON CHANNEL VIADUCT BRIDGE REHAB

Sector: Bridge • Location: CA, United States of America

Source: US Department of Transportation (USDOT)

Project
Closed

Other Agencies with Actions or Authorizations: Department of the Interior, Fish and Wildlife Service California Department of Commerce, National Oceanic and Atmospheric Administration Department of the Army, US Army Corps of Engineers - Civil Works Description: Caltrans proposes to rehabilitate the northbound and the southbound bridges on I-5 that span the Stockton Channel. The bridges are approxi

Project Information FAQ

Project Information

5 Q
The project “STOCKTON CHANNEL VIADUCT BRIDGE REHAB” is an infrastructure initiative in the Bridge sector, located in CA, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: Department of the Interior, Fish and Wildlife Service California Department of Commerce, National Oceanic and Atmospheric Administration Department of the Army, US Army Corps of Engineers - Civil Works Description: Caltrans proposes to rehabilitate the northbound and the southbound bridges on I-5 that span the Stockton Channel. The bridges are approximately 2725’ in length. The existing deck will be replaced, and the existing superstructure elements will be strengthened to meet current AASHTO LRFD standards. The existing bridge railings will also be upgraded to meet the latest FHWA safety standards. The existing substructure will be evaluated and rehabilitated to meet current AASHTO LRFD standards. Additionally, the existing piers will be analyzed for scour, and scour counter measures will be utilized as required. The bridge piers that are located within navigational waters will also be protected from impact by sea vessels by use of fender systems as required. This project will require traffic handling as I-5 is a major corridor for goods and services movement. The environmental aspects due to the work in the waterway, as well as any right of way impacts will be addressed. Coordination with multiple partners and stakeholders will be required, as well as utility coordination. There will also be coordination with the US Coast Guard as the project is located within navigational waters. This project also entails the construction of a new standalone structure which will function as an offramp to Pershing Avenue. This new structure will connect I-5 Northbound in the vicinity of SR 4 to the northbound Pershing Avenue, it will widen the I-5 Norhtbound, and span the Stockton Channel.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data