STOCKTON CHANNEL VIADUCT BRIDGE REHAB
Sector: Bridge • Location: CA, United States of America
Source: US Department of Transportation (USDOT)
Other Agencies with Actions or Authorizations: Department of the Interior, Fish and Wildlife Service California Department of Commerce, National Oceanic and Atmospheric Administration Department of the Army, US Army Corps of Engineers - Civil Works Description: Caltrans proposes to rehabilitate the northbound and the southbound bridges on I-5 that span the Stockton Channel. The bridges are approxi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Other Agencies with Actions or Authorizations: Department of the Interior, Fish and Wildlife Service California Department of Commerce, National Oceanic and Atmospheric Administration Department of the Army, US Army Corps of Engineers - Civil Works Description: Caltrans proposes to rehabilitate the northbound and the southbound bridges on I-5 that span the Stockton Channel. The bridges are approximately 2725’ in length. The existing deck will be replaced, and the existing superstructure elements will be strengthened to meet current AASHTO LRFD standards. The existing bridge railings will also be upgraded to meet the latest FHWA safety standards. The existing substructure will be evaluated and rehabilitated to meet current AASHTO LRFD standards. Additionally, the existing piers will be analyzed for scour, and scour counter measures will be utilized as required. The bridge piers that are located within navigational waters will also be protected from impact by sea vessels by use of fender systems as required. This project will require traffic handling as I-5 is a major corridor for goods and services movement. The environmental aspects due to the work in the waterway, as well as any right of way impacts will be addressed. Coordination with multiple partners and stakeholders will be required, as well as utility coordination. There will also be coordination with the US Coast Guard as the project is located within navigational waters. This project also entails the construction of a new standalone structure which will function as an offramp to Pershing Avenue. This new structure will connect I-5 Northbound in the vicinity of SR 4 to the northbound Pershing Avenue, it will widen the I-5 Norhtbound, and span the Stockton Channel. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
