logo
ProjectPre-Design

Stonebridge Trail Bridge Replacement

Pre-design · Illinois · Last reported Apr 2024

Source: Dodge USA

The wood timber piles used to support this bridge have experienced section loss. Repairs to these individual piles are cost prohibitive and construction of a new structure is recommended.

Status
Prospective
Sector
Forest Products and Packaging, Bridge, Mass Transit, Government, Rail, Commercial
Location
Wheaton, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Stonebridge Trail Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Stonebridge Trail Bridge Replacement” is an infrastructure initiative in the Forest Products and Packaging sector, located in Wheaton, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The wood timber piles used to support this bridge have experienced section loss. Repairs to these individual piles are cost prohibitive and construction of a new structure is recommended.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Wheaton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Bridge, Mass Transit, Government, Rail, Commercial

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project