Store Hessi Hydroelectric Power Plant and Electricity Transmission Line
The owner, status and timeline of this project. A free account opens every field.
Source: Georgia Online
The project involves the construction of the Store Hessi hydroelectric power plant with a capacity of 47.6 MW and an annual revenue of 208 million kWh. It also includes the construction of a 110 kV electricity transmission line connecting Store Hessi to New Telavi, which will be integrated into the Georgian electricity transmission network.
- Status
- Under Construction
- Sector
- Metal, Power Generation (CCGT), Power Transmission, Residential, Commercial, Government
- Location
- Telavi, Kakheti, Georgia
- Updated
- 22 Jul 2026
- Source
- Georgia Online
ConstructChat
Ask ConstructChat about Store Hessi Hydroelectric Power Plant and Electricity Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of the Store Hessi hydroelectric power plant with a capacity of 47.6 MW and an annual revenue of 208 million kWh. It also includes the construction of a 110 kV electricity transmission line connecting Store Hessi to New Telavi, which will be integrated into the Georgian electricity transmission network. |
Original sector | Energy |
Budget |
Location
Country | Georgia |
State | Kakheti |
City | Telavi |
Source
Source | Georgia Online |
URL |
More Details
Record type | Project |
Sector | Metal, Power Generation (CCGT), Power Transmission, Residential, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in Georgia
- EnergoPro hydro plant (Lajanuri, Rioni, Gumati, Shaori, Dzevrula and Ats)
- Supsa Terminal and Pipeline, Georgia
- United Energy Distribution Company of Georgia (UEDC) and Distribution Company of Adjara (EDCA)
- Tango Water Project
- Georgia: Tbilisi Metro Modernization Project
- Georgia: Tbilisi Metro Modernization Project
- Georgia: Tbilisi Metro Modernization Project
- Georgia: Tbilisi Metro Modernization Project
