Storm Drain Outfall
Bid results · Utah · Last reported Apr 2024
Source: Dodge USA
The principal items of work are approximately as follows: Regrade existing channel, replace culverts. Project will consist of reshaping over a mile of storm drain ditch, replacing 10 concrete structures, and looping utilties along the storm drain ditch. Sheet piles will need to be installed fro about 1600 feet along the ditch.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial
- Location
- Pleasant Grove, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Storm Drain Outfall
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The principal items of work are approximately as follows: Regrade existing channel, replace culverts. Project will consist of reshaping over a mile of storm drain ditch, replacing 10 concrete structures, and looping utilties along the storm drain ditch. Sheet piles will need to be installed fro about 1600 feet along the ditch. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Pleasant Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
