Storm Sewer Phase III
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
: The work involves excavations, installation of 675 mm storm line, re-construction of the existing roadway, sidewalks, tie-in to existing storm manhole, new catch basins, milling of the existing asphalt pavement, gravel parking lot and other works. Installation of 1.8-meter-high rigid temporary fencing around working area within school ground, quality control, survey work, strip and stockpile top
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Redwater, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Storm Sewer Phase III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | : The work involves excavations, installation of 675 mm storm line, re-construction of the existing roadway, sidewalks, tie-in to existing storm manhole, new catch basins, milling of the existing asphalt pavement, gravel parking lot and other works. Installation of 1.8-meter-high rigid temporary fencing around working area within school ground, quality control, survey work, strip and stockpile topsoil 100 mm to 200mm depth, excavation and disposal incl. road structure below roadway & grading ... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Redwater |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
